Anchor a 4 x 4 x 1 1 2 in.
Ataching electric meter to house before siding.
Also make sure you know where your meter can will sit if you re going to have a different mounting block for it.
What to do with siding around electrical meter i am planning on re siding my house this october and i ran into a problem while trying to plan everything out.
I am adding 2 of insulation to the walls and then furing strips followed by vinyl siding.
In many older homes the incoming electric service cable has a cloth type covering.
Open a knock out on top of the meter box to fit the riser pole width.
In the case where your meter is on a pole away from the building your responsibility will usually start where the service wires are attached at the top of the pole.
Then preventative measures must be taken so the damage does not reoccur and the cure is permanent.
Add siding to all material estimates to allow for waste depending on the pitch of the roof and other house specific factors.
Secure the conduit with a conduit strap.
These fixtures and outlets will be attached to mounting blocks that are installed during the siding process so make sure the rough ins are done.
To repair the electrical meter box a new non damaged meter base is installed.
I ve installed siding many times before but always while working for someone else on new construction.
Metal junction box and attach a length of conduit to it with a conduit connector you ll need two conduits for two cables.
Secure the box to the wall according to manufacturer recommendations.
You will have exterior lights and outlets that need to be in place before siding.
There are four screws on each of the box s corners.
I would install the chink siding first and then attach the electrical box to the wall through the siding.
Insert the meter box into the riser pipe then secure it with a connector and a locknut of the same size as the pipe used.
If you install the meter box first imagine what the water that runs down the siding above the meter will do once it reaches the meter.
The position of your electric meter has nothing to do with where your responsibility starts.
First the mounting location for the meter base on the side of the house must be repaired so the new meter base can be safely and securely attached to the building.